Showing posts with label construction. Show all posts
Showing posts with label construction. Show all posts
Sunday, November 22, 2009
Construction on Panther Hollow Road Appears to be Over [Aphilotus! Aphilotus!]
Looks all new and patched and shiny, too!
Labels:
aphilotus,
construction,
scheneley park
Friday, October 23, 2009
Panther Hollow Road is Under Construction! [Aphilotus! Aphilotus!]
In Schenley Park, the main drag, Panther Hollow Road, is being rebuilt.

I knew there was trouble when some time over the summer, jersey barriers appeared in the northern (westbound) emergency lane, routing pedestrian traffic around a bad section of sidewalk that used to have a metal guard rail, as the hill down into Panther Hollow is quite steep there. Before the Jersey Barriers were up, that sidewalk looked like this:
In mid-September, the Jersey Barriers expanded again, taking over the whole north (westbound) side of the road- both lanes- for a few hundred feet. More barriers were erected to squeeze the eastbound traffic down to one lane (the southmost of the four lanes) and squeeze the westbound traffic across the double-yellow-line over into the second-most-southern lane, which usually is the fast east-bound-lane.
As far as we can tell, the whole sidewalk and north-most lane collapsed and started sliding down the hillside, and the construction crews are there to repair and replace that part of the hill with stronger soil- probably gravel, so that Panther Hollow Road stops trying to sink into its namesake.
A few days ago we photographed the whole thing as we drove through it. Enjoy the Aphilotus-o-mation!

I knew there was trouble when some time over the summer, jersey barriers appeared in the northern (westbound) emergency lane, routing pedestrian traffic around a bad section of sidewalk that used to have a metal guard rail, as the hill down into Panther Hollow is quite steep there. Before the Jersey Barriers were up, that sidewalk looked like this:
In mid-September, the Jersey Barriers expanded again, taking over the whole north (westbound) side of the road- both lanes- for a few hundred feet. More barriers were erected to squeeze the eastbound traffic down to one lane (the southmost of the four lanes) and squeeze the westbound traffic across the double-yellow-line over into the second-most-southern lane, which usually is the fast east-bound-lane.
As far as we can tell, the whole sidewalk and north-most lane collapsed and started sliding down the hillside, and the construction crews are there to repair and replace that part of the hill with stronger soil- probably gravel, so that Panther Hollow Road stops trying to sink into its namesake.
A few days ago we photographed the whole thing as we drove through it. Enjoy the Aphilotus-o-mation!
Labels:
aphilotus,
construction,
scheneley park,
street exploration
Subscribe to:
Posts (Atom)
